Build journal / Verified project updates
Show the work.
A record of completed development, open questions and the next experiment. No invented adoption, performance or security claims.
08 November 2026 / Local tooling 0.3
Wallets, receipts and miner jobs.
Two validated development cycles added an encrypted ML-DSA-65 wallet, bounded signed-transaction submission with durable receipts, and a versioned CPU miner job/solution CLI. All 49 tests passed, including independent C++ share verification, fee burning, replay and restart recovery.
These are development tools. The miner CLI is standalone and does not yet submit work to the persistent service. The final mining algorithm remains unfinished.
Download source 0.3 ↗08 November 2026 / Server operations
A persistent development chain.
The ledger now saves its chain in SQLite, replays it at startup, and resumes after a restart. All 21 server tests passed, including process-crash recovery and corrupt-state rejection. A move onto the large storage partition preserved the existing chain and identity.
The CUDA SHA-256 baseline produced an independently verified result. The 4 GiB memory probe passed 16 sampled lane checks on an RTX 3050. These are baseline and synthetic results, not final proof-of-work validation.
See the verified status →08 November 2026 / Release 0.2
A signed transfer, end to end.
The local ledger now verifies ML-DSA-65 signatures, validates UTXO ownership and value, applies coinbase maturity, rejects invalid blocks and accounts for fee burning. A four-block demonstration completed a transfer and replayed the export using a fresh instance of the same implementation.
Validation: 16 automated cases passed, including the original hash/accounting checks and new rejection tests for double spends, signature changes, cross-network contexts, invalid ownership, reward overpayment and bad development work.
Limit: this is a local development harness with fixed, trivial SHA-256 work. Peer networking, a public network, final GPU mining and security audit are not complete.
Explore the developer release →08 November 2026 / Hardware research
Bandwidth is the hypothesis.
The mining research now explicitly targets H200 and B300 performance alongside RTX 5090 viability. The dataset candidate is 20 GiB, with smaller sizes retained for comparison. A larger allocation alone does not prevent ASICs or establish a GPU advantage.
A CUDA memory probe and independent host sample check are included as source. Those hardware runs were pending in the original release; the later server entry above records the completed baseline and 4 GiB probe checks. No hashrate or energy-efficiency result is published.
08 November 2026 / Initial design
The first protocol proposal.
The initial whitepaper proposes post-quantum authorization, capped issuance, a transaction-fee burn and open GPU participation. The project name remains provisional. There is no live asset, token sale or promised launch date.
Read the original draft ↗Next milestone
Measure before committing.
Run the GPU workload on actual NVIDIA hardware, publish reproducible measurements and evaluate verifier costs and shortcuts. Build peer networking only around an explicit, reviewed consensus specification.